F0902JobCostProjections

F0902 Job Cost Projections

Master Business Function

Object Name: X51013

Parent DLL: CAEC

Location: Client/Server

Language: C

Purpose
Calculate the projected final amount and unit for accounts in job cost. The projected final ledger types are HA and HU in the F0902. The budget 

changes, IA and IU, are also calculated for methods 'R' and 'A'. 


Setup Notes and Prerequisites

• Any Progress Entry Data must be in the Account Balances (F0902)
• Pass in the Long Account Information or the Short Account ID
• All parameter passing I/O should have a variable to return the value back to the routine. The 
routine will populate the information on the first pass, and it retain the information by passing it both 

directions.

'b7'b7


Special Logic

The processing varies from the AS/400 technology. The functionality should be the same.

Data Structure

D51013 - F0902 Job Cost Projections

Parameter NameData ItemData TypeReq/OptI/O/Both
szAccountIDAIDcharREQINPUT

A number that the system assigns to each general ledger account in the Account Master table (F0901) to uniquely identify it. 

szCompanyCOcharOPTNONE

A code that identifies a specific organization, fund, or other reporting entity. The company code must already exist in the Company 
Constants table (F0010) and must identify a reporting entity that has a complete balance sheet. At this level, you can have intercompany 
transactions. Note: You can use company 00000 for default values such as dates and automatic accounting instructions. You cannot use company 00000 
for transaction entries.

szJobMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

szCostTypeOBJcharOPTNONE

The portion of a general ledger account that refers to the division of the Cost Code (for example, labor, materials, and equipment) into 
subcategories. For example, you can divide the Cost Code for labor into regular time, premium time, and burden. Note: If you use a flexible chart of 
accounts and the object account is set to 6 digits, J.D. Edwards recommends that you use all 6 digits. For example, entering 000456 is not 
the same as entering 456 because if you enter 456 the system enters three blank spaces to fill a 6-digit object.

szCostCodeSUBcharOPTNONE

A subset of an object account. Subsidiary accounts include detailed records of the accounting activity for an object account.

mnCenturyCTRYMATH_NUMERICOPTNONE

The calendar century associated with the year. Enter is the first two digits of the year. For example, 19 indicates any year beginning with 19 
(1998, 1999), 20 indicates any year beginning with 20 (2000, 2001), and so on.

mnFiscalYearFYMATH_NUMERICOPTNONE

A number that identifies the fiscal year. Generally, you can either enter a number in this field or leave it blank to indicate the current fiscal 
year (as defined on the Company Setup form). Specify the year at the end of the first period rather than the year at the end of the fiscal period. 
For example, a fiscal year begins October 1, 1998 and ends September 30, 1999. The end of the first period is October 31, 1998. Specify the 
year 98 rather than 99.

mnThruCenturyCTRYMATH_NUMERICOPTNONE

The calendar century associated with the year. Enter is the first two digits of the year. For example, 19 indicates any year beginning with 19 
(1998, 1999), 20 indicates any year beginning with 20 (2000, 2001), and so on.

mnThruFiscalYearFYMATH_NUMERICOPTNONE

A number that identifies the fiscal year. Generally, you can either enter a number in this field or leave it blank to indicate the current fiscal 
year (as defined on the Company Setup form). Specify the year at the end of the first period rather than the year at the end of the fiscal period. 
For example, a fiscal year begins October 1, 1998 and ends September 30, 1999. The end of the first period is October 31, 1998. Specify the 
year 98 rather than 99.

mnPeriodPNMATH_NUMERICOPTNONE

A number indicating the current accounting period.  This number, used in conjunction with the Company Constants table (F0010) and the 
General Constants table (F0009), allows the user to define up to 14 accounting periods. See General Ledger Date.  The current period number 
is used to determine posted before and posted after cut off warning messages.  It is also used as the default accounting period in the 
preparation of financial reports.

mnThruPeriodPNMATH_NUMERICOPTNONE

A number indicating the current accounting period.  This number, used in conjunction with the Company Constants table (F0010) and the 
General Constants table (F0009), allows the user to define up to 14 accounting periods. See General Ledger Date.  The current period number 
is used to determine posted before and posted after cut off warning messages.  It is also used as the default accounting period in the 
preparation of financial reports.

cMethodOfComputationCCTcharOPTNONE

The method the system uses to calculate the percent complete, the projected final cost, and unit quantity for an account. Method of 
computation is a user defined code (51/MC).

cOriginalMethodOfComputationCCTcharOPTNONE

The method the system uses to calculate the percent complete, the projected final cost, and unit quantity for an account. Method of 
computation is a user defined code (51/MC).

cValueFlagEV01charREQINPUT

An option that specifies the type of processing for an event.

mnActualAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnActualUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnRevisedBudgetAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRevisedBudgetUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnCommitmentAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnCommitmentUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnProjectedFinalAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnProjectedFinalUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnForcedAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnForcedUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnPercentCompletePCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

mnPercentCompleteThresholdPCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

mnRemainingUnitCostPRRCE1MATH_NUMERICOPTNONE

The unit cost of one item, as purchased from the supplier, excluding freight, taxes, discounts and other factors that might modify the actual 
unit cost you record when you receive the item.

szExtendedJobMasterMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

cProjectionAuditTrailCGTcharOPTNONE

Controls whether the system creates an audit trail (F0911 records) for changes to the job cost projections (ledger types HA and HU). Valid 
values are:    Y Yes, create an audit trail for changes to the job cost projections.    N No, do not create an audit trail.

cBudgetAuditTrailBATcharOPTNONE

A constant that controls whether the system creates audit trail records (F0911) for changes to a budget, which are kept in ledger types IA 
and IU. These audit trail records are stored in the Ledger Type Master File (F0025) table. This constant relates only to methods of computation 
A and R. Valid values are:    Y Yes, create an audit trail for budget changes.    N No, do not create an audit trail.

cJobCostProjectionsJCPcharOPTNONE

Controls whether the system updates and saves projected final amounts and quantities (ledger types HA and HU, respectively) in the 
Account Balances table (F0902). Valid values are:    Y Yes, update and save projections.    N No, do not update and save projections.

cSuppressErrorMessageEV01charOPTNONE

An option that specifies the type of processing for an event.

szErrorMessageDTAIcharOPTNONE

A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
special characters such as %, &, or +. You create new data items using system codes 55-59. You cannot change the alias.

jdEndPeriodDateDGLJDEDATEOPTNONE

A date that identifies the financial period to which the transaction is to be posted.  The company constants specify the date range for each 
financial period. You can have as many as 14 periods. Generally, period 14 is used for audit adjustments. The system validates this field for 
PBCO (posted before cutoff), PYEB (prior year ending balance), PACO (post after cutoff), and WACO (post way after cutoff) messages.

szProgramIdPIDcharOPTNONE

The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry 
interactive program is P4210, and the number of the Print Invoices batch process report is R42565. The program ID is a variable length value. 
It is assigned according to a structured syntax in the form TSSXXX, where: T The first character of the number is alphabetic and identifies the 
type, such as P for Program, R for Report, and so on. For example, the value P in the number P4210 indicates that the object is a 
program. SS The second and third characters of the number are numeric and identify the system code. For example, the value 42 in the number P4210 
indicates that this program belongs to system 42, which is the Sales Order Processing system. XXX The remaining characters of the numer are 
numeric and identify a unique program or report. For example, the value 10 in the number P4210 indicates that this is the Sales Order Entry 
program.

mnEACAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnEACUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnChangePercentPCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

Related Functions

B5100007 F0902 Access Original Budget
B5100016 Validate Job Cost Date and Period
B5100020 F0902 Job Cost Update Balances
X0005 Get User Defined Codes
X0051 F0902 Balance Retrieval
XX0901 Validate Account Number

Related Tables

F0006 Business Unit Master
F0026 Job Cost Constants
F0901 Account Master
F5108 Extended Job Master
TerminateCache

TerminateCache

F0902 Job Cost Projections

Minor Business Rule

Object Name: X51013

Parent DLL: CAEC

Location: Client/Server

Language: C

Data Structure

D51013 - F0902 Job Cost Projections

Parameter NameData ItemData TypeReq/OptI/O/Both
szAccountIDAIDcharREQINPUT

A number that the system assigns to each general ledger account in the Account Master table (F0901) to uniquely identify it. 

szCompanyCOcharOPTNONE

A code that identifies a specific organization, fund, or other reporting entity. The company code must already exist in the Company 
Constants table (F0010) and must identify a reporting entity that has a complete balance sheet. At this level, you can have intercompany 
transactions. Note: You can use company 00000 for default values such as dates and automatic accounting instructions. You cannot use company 00000 
for transaction entries.

szJobMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

szCostTypeOBJcharOPTNONE

The portion of a general ledger account that refers to the division of the Cost Code (for example, labor, materials, and equipment) into 
subcategories. For example, you can divide the Cost Code for labor into regular time, premium time, and burden. Note: If you use a flexible chart of 
accounts and the object account is set to 6 digits, J.D. Edwards recommends that you use all 6 digits. For example, entering 000456 is not 
the same as entering 456 because if you enter 456 the system enters three blank spaces to fill a 6-digit object.

szCostCodeSUBcharOPTNONE

A subset of an object account. Subsidiary accounts include detailed records of the accounting activity for an object account.

mnCenturyCTRYMATH_NUMERICOPTNONE

The calendar century associated with the year. Enter is the first two digits of the year. For example, 19 indicates any year beginning with 19 
(1998, 1999), 20 indicates any year beginning with 20 (2000, 2001), and so on.

mnFiscalYearFYMATH_NUMERICOPTNONE

A number that identifies the fiscal year. Generally, you can either enter a number in this field or leave it blank to indicate the current fiscal 
year (as defined on the Company Setup form). Specify the year at the end of the first period rather than the year at the end of the fiscal period. 
For example, a fiscal year begins October 1, 1998 and ends September 30, 1999. The end of the first period is October 31, 1998. Specify the 
year 98 rather than 99.

mnThruCenturyCTRYMATH_NUMERICOPTNONE

The calendar century associated with the year. Enter is the first two digits of the year. For example, 19 indicates any year beginning with 19 
(1998, 1999), 20 indicates any year beginning with 20 (2000, 2001), and so on.

mnThruFiscalYearFYMATH_NUMERICOPTNONE

A number that identifies the fiscal year. Generally, you can either enter a number in this field or leave it blank to indicate the current fiscal 
year (as defined on the Company Setup form). Specify the year at the end of the first period rather than the year at the end of the fiscal period. 
For example, a fiscal year begins October 1, 1998 and ends September 30, 1999. The end of the first period is October 31, 1998. Specify the 
year 98 rather than 99.

mnPeriodPNMATH_NUMERICOPTNONE

A number indicating the current accounting period.  This number, used in conjunction with the Company Constants table (F0010) and the 
General Constants table (F0009), allows the user to define up to 14 accounting periods. See General Ledger Date.  The current period number 
is used to determine posted before and posted after cut off warning messages.  It is also used as the default accounting period in the 
preparation of financial reports.

mnThruPeriodPNMATH_NUMERICOPTNONE

A number indicating the current accounting period.  This number, used in conjunction with the Company Constants table (F0010) and the 
General Constants table (F0009), allows the user to define up to 14 accounting periods. See General Ledger Date.  The current period number 
is used to determine posted before and posted after cut off warning messages.  It is also used as the default accounting period in the 
preparation of financial reports.

cMethodOfComputationCCTcharOPTNONE

The method the system uses to calculate the percent complete, the projected final cost, and unit quantity for an account. Method of 
computation is a user defined code (51/MC).

cOriginalMethodOfComputationCCTcharOPTNONE

The method the system uses to calculate the percent complete, the projected final cost, and unit quantity for an account. Method of 
computation is a user defined code (51/MC).

cValueFlagEV01charREQINPUT

An option that specifies the type of processing for an event.

mnActualAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnActualUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnRevisedBudgetAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRevisedBudgetUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnCommitmentAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnCommitmentUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnProjectedFinalAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnProjectedFinalUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnForcedAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnForcedUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnPercentCompletePCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

mnPercentCompleteThresholdPCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

mnRemainingUnitCostPRRCE1MATH_NUMERICOPTNONE

The unit cost of one item, as purchased from the supplier, excluding freight, taxes, discounts and other factors that might modify the actual 
unit cost you record when you receive the item.

szExtendedJobMasterMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

cProjectionAuditTrailCGTcharOPTNONE

Controls whether the system creates an audit trail (F0911 records) for changes to the job cost projections (ledger types HA and HU). Valid 
values are:    Y Yes, create an audit trail for changes to the job cost projections.    N No, do not create an audit trail.

cBudgetAuditTrailBATcharOPTNONE

A constant that controls whether the system creates audit trail records (F0911) for changes to a budget, which are kept in ledger types IA 
and IU. These audit trail records are stored in the Ledger Type Master File (F0025) table. This constant relates only to methods of computation 
A and R. Valid values are:    Y Yes, create an audit trail for budget changes.    N No, do not create an audit trail.

cJobCostProjectionsJCPcharOPTNONE

Controls whether the system updates and saves projected final amounts and quantities (ledger types HA and HU, respectively) in the 
Account Balances table (F0902). Valid values are:    Y Yes, update and save projections.    N No, do not update and save projections.

cSuppressErrorMessageEV01charOPTNONE

An option that specifies the type of processing for an event.

szErrorMessageDTAIcharOPTNONE

A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
special characters such as %, &, or +. You create new data items using system codes 55-59. You cannot change the alias.

jdEndPeriodDateDGLJDEDATEOPTNONE

A date that identifies the financial period to which the transaction is to be posted.  The company constants specify the date range for each 
financial period. You can have as many as 14 periods. Generally, period 14 is used for audit adjustments. The system validates this field for 
PBCO (posted before cutoff), PYEB (prior year ending balance), PACO (post after cutoff), and WACO (post way after cutoff) messages.

szProgramIdPIDcharOPTNONE

The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry 
interactive program is P4210, and the number of the Print Invoices batch process report is R42565. The program ID is a variable length value. 
It is assigned according to a structured syntax in the form TSSXXX, where: T The first character of the number is alphabetic and identifies the 
type, such as P for Program, R for Report, and so on. For example, the value P in the number P4210 indicates that the object is a 
program. SS The second and third characters of the number are numeric and identify the system code. For example, the value 42 in the number P4210 
indicates that this program belongs to system 42, which is the Sales Order Processing system. XXX The remaining characters of the numer are 
numeric and identify a unique program or report. For example, the value 10 in the number P4210 indicates that this is the Sales Order Entry 
program.

mnEACAmountAO1OWMATH_NUMERICOPTNONE

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnEACUnitsUN1OWMATH_NUMERICOPTNONE

The method of computation and the processing option determine which fields appear on this form. Valid values are:   o   +/-  Actual. This field 
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.   o  
Total Actual  This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/- 
actual units.   o  Force +/- Units  This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The 
system calculates force units.   o  Force Total Units  This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger. 
The system calculates +/- force units.   o  Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the 
Percent Complete (F%) ledger.   o  Estimate to Complete Units  This field appears only with Method E. The system adds the values in this field, the 
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected 
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  Estimate Total Units  This 
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA) 
and Projected Final Units (HU) ledgers.

mnChangePercentPCMATH_NUMERICOPTNONE

A measurement that identifies the progress being made on an item such as an account, work order, and so on. It is not always a calculated 
field and may need to be updated manually.

Related Functions

B5100007 F0902 Access Original Budget
B5100016 Validate Job Cost Date and Period
B5100020 F0902 Job Cost Update Balances
X0005 Get User Defined Codes
X0051 F0902 Balance Retrieval
XX0901 Validate Account Number

Related Tables

F0006 Business Unit Master
F0026 Job Cost Constants
F0901 Account Master
F5108 Extended Job Master