D968901I - Structure - Calculate End Date and Time
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
jdDateStart | STRT | JDEDATE | REQ | INPUT |
The start date for the order. You can enter this date manually, or have the system calculate it using a backscheduling routine. The routine
| ||||
mnBeginningHhMmSs | PBTM | MATH_NUMERIC | REQ | INPUT |
A field that is used to enter the beginning time of the operation sequence for the work center operation on the routing. | ||||
mnTimeInSeconds | MATH01 | MATH_NUMERIC | REQ | INPUT |
- - - Good Performance Low Value. | ||||
jdDateCompletion | STRX | JDEDATE | OPT | OUTPUT |
The date that the work order or engineering change order is completed or canceled. | ||||
mnEndingHhMmSs | PETM | MATH_NUMERIC | OPT | OUTPUT |
A field that is used to enter the ending time of the operation sequence for the work center operation on the routing. |
None |
None |