A code that controls G/L posting and account balance updates in the Account Master table (F0901). Valid values are:
Blank
Allows all
posting. Posts subledgers in detailed format for every account transaction. Does not require subledger entry.
B
Only allows posting to budget
ledger types starting with B or J.
I
Inactive account. No posting allowed.
L
Subledger and type are required for all transactions. Posts subledgers in
detailed format for every account. The system stores the subledger and type in the Account Ledger (F0911) and Account Balances (F0902)
tables. If you want to report on subledgers in the Financial Reporting feature, use this code.
M
Machine-generated transactions only (post
program creates offsets).
N
Non-posting. Does not allow any post or account balance updates. In the Job Cost system, you can still post budget
quantities.
S
Subledger and type are required for all transactions. Posts subledgers in summary format for every transaction. The system
stores the subledger detail in the Account Ledger table. This code is not valid for budget entry programs.
U
Unit quantities are required for all
transactions.
X
Subledger and type must be blank for all transactions. Does not allow subledger entry for the account. |
The method of computation and the processing option determine which fields appear on this form. Valid values are:
o +/-
Actual. This field
appears with every method of computation. Incremental change to the Actual Units (AU) ledger. The system calculates total actual units.
o
Total Actual
This field appears with every method of computation. The new total in the Actual Units (AU) ledger. The system calculates +/-
actual units.
o Force +/- Units
This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Units (FU) ledger. The
system calculates force units.
o Force Total Units
This field appears with Methods F, G, O, Q, and S. The new total in the Force Units (FU) ledger.
The system calculates +/- force units.
o Percent Complete This field appears only with Methods F, G, O, P, and S. The new total in the
Percent Complete (F%) ledger.
o Estimate to Complete Units
This field appears only with Method E. The system adds the values in this field, the
Estimate to Complete Amounts, and Unit Rate fields to the Actual Units and Actual Amounts fields to determine the estimate total (projected
final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.
o Estimate Total Units
This
field appears only with Method E. The values in this field are the projected final values. The system updates the Projected Final Amounts (HA)
and Projected Final Units (HU) ledgers.
|
The portion of a general ledger account that refers to the division of the Cost Code (for example, labor, materials, and equipment) into
subcategories. For example, you can divide the Cost Code for labor into regular time, premium time, and burden.
Note: If you use a flexible chart of
accounts and the object account is set to 6 digits, J.D. Edwards recommends that you use all 6 digits. For example, entering 000456 is not
the same as entering 456 because if you enter 456 the system enters three blank spaces to fill a 6-digit object. |