D4803220A - Get Next Available Metric Period
| Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both | 
|---|---|---|---|---|
| cErrorCode_ERRC | ERRC | char | OPT | NONE | 
This error code indicates if any errors occurred during the creation of the Trip Document Detail (F4914) records by the Delivery Document 
  | ||||
| szErrorMessageID_DTAI | DTAI | char | OPT | NONE | 
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
  | ||||
| cSuppressErrorMessage_SUPPS | SUPPS | char | OPT | NONE | 
A flag indicating whether or not runtime error messaging will occur when an error message is issued from a business function.
       0 = allow 
  | ||||
| mnManager_ANSA | ANSA | MATH_NUMERIC | REQ | INPUT | 
The address book number of a manager or planner.  
Note:  A processing option for some forms allows you to enter a default value for this 
  | ||||
| jdNextPeriodStart_SESD | SESD | JDEDATE | OPT | OUTPUT | 
The calendar date that an operation or rate is scheduled to begin.  | ||||
| jdNextPeriodEnd_SEED | SEED | JDEDATE | OPT | OUTPUT | 
The calendar date that an activity or rate is scheduled to end. This date is calculated by the constraints-based planning system.  | ||||
| cDateSchedulePattern_DTSPN | DTSPN | char | REQ | INPUT | 
A code used to specify a Schedule Pattern utilized in maintenance scheduling. For example, M could stand for a weekly scheduling pattern 
  | ||||
| jdDate_DTFR | DTFR | JDEDATE | OPT | INPUT | 
The beginning date for which the transaction or code is applicable.  | ||||
| cOnlyReturnNextPeriod_EV01 | EV01 | char | OPT | INPUT | 
An option that specifies the type of processing for an event.  | ||||
| None | 
| None |