D4803110 - Resource Assignment Hours Distribution
| Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
|---|---|---|---|---|
| cMode_EV01 | EV01 | char | REQ | INPUT |
This field is used to specify the mode for the function.
| ||||
| cDistributionMethod_EV01 | EV01 | char | OPT | INPUT |
(FUTURE)
| ||||
| szResourceType_RRTY | RRTY | char | REQ | INPUT |
This field is used to identify the resource type. This field is used to identify the resource being ADDED or the resource
| ||||
| mnResourceNumber_RSCN | RSCN | MATH_NUMERIC | OPT | INPUT |
This field is used to identify the resource number. Currently this field is not being used.
| ||||
| mnOrderNumber_DOCO | DOCO | MATH_NUMERIC | OPT | INPUT |
This field represents the work order number that the resource is being ADDED to or DELETED from.
| ||||
| mnOperationSequence_OPSQ | OPSQ | MATH_NUMERIC | OPT | INPUT |
This field represents part of the key to the routing step that the resource is being ADDED to or DELETED from.
| ||||
| szOperationTypeCode_OPSC | OPSC | char | OPT | INPUT |
This field represents part of the key to the routing step that the resource is being ADDED to or DELETED from.
| ||||
| szCostCenter_MCU | MCU | char | OPT | INPUT |
This field represents part of the key to the routing step that the resource is being ADDED to or DELETED from.
| ||||
| mnEstimatedHours | HRSO | MATH_NUMERIC | OPT | INPUT |
This field is used to pass the estimated hours either from the work order header(HRSO) or the routing labor
| ||||
| mnEstimatedMachineHours | RUNM | MATH_NUMERIC | OPT | INPUT |
This field is used to pass the estimated machine hours from the routing machine hours(RUNM).
| ||||
| mnAssignedHours_AHRS | AHRS | MATH_NUMERIC | OPT | OUTPUT |
This field is used to pass back the assigned hours for the resource that is being ADDED.
| ||||
| mnEstCapacityPerDay_AHRS | AHRS | MATH_NUMERIC | OPT | INPUT |
A number that indicates the hours that have been assigned to this task. | ||||
| cPeriodType | PDTP | char | OPT | INPUT |
A code that indicates the period type that appears in the Resource Assignments Workbench program (P48331). The Resource
| ||||
| nNumberOfPeriods | INT01 | integer | OPT | INPUT |
Number of Days in Future to Query for Responses Due. | ||||
| szSDInclusionRule | MVER | char | OPT | INPUT |
A user defined code (40/RV) that identifies an inclusion rule that you want the system to use for this branch/plant. The Manufacturing and
| ||||
| None |
| None |