D44H0128 - F44H401 Update sales price, gross profit pct, and other data
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
cProgrammerMode_EV01 | EV01 | char | REQ | INPUT |
An option that specifies the type of processing for an event. | ||||
szArea_HBAREA | HBAREA | char | REQ | INPUT |
A component, typically a company division or geographic region, that is larger than a community. Large homebuilders might have many
| ||||
szCommunity_HBMCUS | HBMCUS | char | REQ | INPUT |
A value that specifies a community, project, or subdivision. A community is a distinct grouping of lots which can be grouped together
| ||||
szPhase_CPHASE | CPHASE | char | REQ | INPUT |
A code that indicates the number of a specific phase within a community. | ||||
szPlan_HBPLAN | HBPLAN | char | REQ | INPUT |
A value that specifies a plan within a community. A plan represents an architectural design based on an arrangement, location and size of
| ||||
szElev_HBELEV | HBELEV | char | REQ | INPUT |
A value that specifies the type of elevation used on a lot. When a unit is built on a lot, the lot is identified by plan, elevation, and swing. A
| ||||
szOption_OPTION | OPTION | char | REQ | INPUT |
A specific upgrade not included in the base house price and cost. In the General Accounting and Job Cost systems, this field corresponds
| ||||
mnNewSalesPrice_CSPR | CSPR | MATH_NUMERIC | OPT | NONE |
Current Option sales prices. Based on the effective date in the Option Master file. | ||||
jdNewEffectiveDate_SPJ | SPJ | JDEDATE | OPT | NONE |
Used in Option selection to determine if the current sales price is used or the previous sales price is used. | ||||
jdNewExpirationDate_EXDE | EXDE | JDEDATE | OPT | NONE |
The date on which the employee's professional license expires. | ||||
mnNewGrossProfitPct_HGPP | HGPP | MATH_NUMERIC | OPT | NONE |
A value that is used to calculate a suggested sales price based on the following formula:
Sales Price = Cost / (1-Gross Profit Percentage)
| ||||
mnNewEstimatedCost_AMTO | AMTO | MATH_NUMERIC | OPT | NONE |
The estimated monetary amount that is budgeted for this work order. | ||||
szNewCutOffNotBefore | OPSTAV | char | OPT | NONE |
A user defined code (44H0/RL) that specifies whether to prevent option selection prior to reaching a specified construction stage. | ||||
szNewCutOffNotAfter | OPSTCO | char | OPT | NONE |
A user defined code (44H0/RL) that specifies whether to prevent option selection after a specified construction stage is reached. | ||||
mnNewDepositPct_DPTP | DPTP | MATH_NUMERIC | OPT | NONE |
Used to calculate the dollar amount of the deposit taken from the buyer. | ||||
szNewOptionType | OPTYP | char | OPT | NONE |
A user defined code (44H4/OT) used to categorize options. This value is also used to map option revenue from the Closing Worksheet
| ||||
szProgramId_PID | PID | char | REQ | INPUT |
The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry
| ||||
cErrorFlag_EV01 | EV01 | char | OPT | OUTPUT |
An option that specifies the type of processing for an event. | ||||
szErrorMsg_DTAI | DTAI | char | OPT | OUTPUT |
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or
| ||||
mnPreviousSalesPrice_PSPR | PSPR | MATH_NUMERIC | OPT | NONE |
Previous Option sales price manually entered when changing the Current Option Sales price |
None |
None |