D44H0128 - F44H401 Update sales price, gross profit pct, and other data
| Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both | 
|---|---|---|---|---|
| cProgrammerMode_EV01 | EV01 | char | REQ | INPUT | 
An option that specifies the type of processing for an event.  | ||||
| szArea_HBAREA | HBAREA | char | REQ | INPUT | 
A component, typically a company division or geographic region, that is larger than a community. Large homebuilders might have many 
  | ||||
| szCommunity_HBMCUS | HBMCUS | char | REQ | INPUT | 
A value that specifies a community, project, or subdivision. A community is a distinct grouping of lots which can be grouped together 
  | ||||
| szPhase_CPHASE | CPHASE | char | REQ | INPUT | 
A code that indicates the number of a specific phase within a community.  | ||||
| szPlan_HBPLAN | HBPLAN | char | REQ | INPUT | 
A value that specifies a plan within a community. A plan represents an architectural design based on an arrangement, location and size of 
  | ||||
| szElev_HBELEV | HBELEV | char | REQ | INPUT | 
A value that specifies the type of elevation used on a lot. When a unit is built on a lot, the lot is identified by plan, elevation, and swing. A 
  | ||||
| szOption_OPTION | OPTION | char | REQ | INPUT | 
A specific upgrade not included in the base house price and cost. In the General Accounting and Job Cost systems, this field corresponds 
  | ||||
| mnNewSalesPrice_CSPR | CSPR | MATH_NUMERIC | OPT | NONE | 
Current Option sales prices. Based on the effective date in the Option Master file.  | ||||
| jdNewEffectiveDate_SPJ | SPJ | JDEDATE | OPT | NONE | 
Used in Option selection to determine if the current sales price is used or the previous sales price is used.  | ||||
| jdNewExpirationDate_EXDE | EXDE | JDEDATE | OPT | NONE | 
The date on which the employee's professional license expires.  | ||||
| mnNewGrossProfitPct_HGPP | HGPP | MATH_NUMERIC | OPT | NONE | 
A value that is used to calculate a suggested sales price based on the following formula:  
Sales Price = Cost / (1-Gross Profit Percentage) 
  | ||||
| mnNewEstimatedCost_AMTO | AMTO | MATH_NUMERIC | OPT | NONE | 
The estimated monetary amount that is budgeted for this work order.  | ||||
| szNewCutOffNotBefore | OPSTAV | char | OPT | NONE | 
A user defined code (44H0/RL) that specifies whether to prevent option selection prior to reaching a specified construction stage.  | ||||
| szNewCutOffNotAfter | OPSTCO | char | OPT | NONE | 
A user defined code (44H0/RL) that specifies whether to prevent option selection after a specified construction stage is reached.  | ||||
| mnNewDepositPct_DPTP | DPTP | MATH_NUMERIC | OPT | NONE | 
Used to calculate the dollar amount of the deposit taken from the buyer.  | ||||
| szNewOptionType | OPTYP | char | OPT | NONE | 
A user defined code (44H4/OT) used to categorize options. This value is also used to map option revenue from the Closing Worksheet 
  | ||||
| szProgramId_PID | PID | char | REQ | INPUT | 
The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry 
  | ||||
| cErrorFlag_EV01 | EV01 | char | OPT | OUTPUT | 
An option that specifies the type of processing for an event.  | ||||
| szErrorMsg_DTAI | DTAI | char | OPT | OUTPUT | 
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
  | ||||
| mnPreviousSalesPrice_PSPR | PSPR | MATH_NUMERIC | OPT | NONE | 
Previous Option sales price manually entered when changing the Current Option Sales price  | ||||
| None | 
| None |