D44H0110 - F44H402 Get option package components total price
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
cMode_EV01 | EV01 | char | REQ | INPUT |
An option that specifies the type of processing for an event. | ||||
cReturnFlag_EV01 | EV01 | char | OPT | NONE |
An option that specifies the type of processing for an event. | ||||
cSuppressErrorMessage_SUPPS | SUPPS | char | OPT | NONE |
A flag indicating whether or not runtime error messaging will occur when an error message is issued from a business function.
0 = allow
| ||||
szErrorMessage_DTAI | DTAI | char | OPT | NONE |
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or
| ||||
szHomeBuilderArea | HBAREA | char | OPT | NONE |
A component, typically a company division or geographic region, that is larger than a community. Large homebuilders might have many
| ||||
szCommunity | HBMCUS | char | OPT | NONE |
A value that specifies a community, project, or subdivision. A community is a distinct grouping of lots which can be grouped together
| ||||
szPhaseNumber | CPHASE | char | OPT | NONE |
A code that indicates the number of a specific phase within a community. | ||||
szPlan | HBPLAN | char | OPT | NONE |
A value that specifies a plan within a community. A plan represents an architectural design based on an arrangement, location and size of
| ||||
szElevation | HBELEV | char | OPT | NONE |
A value that specifies the type of elevation used on a lot. When a unit is built on a lot, the lot is identified by plan, elevation, and swing. A
| ||||
szOptionNumber | OPTION | char | OPT | NONE |
A specific upgrade not included in the base house price and cost. In the General Accounting and Job Cost systems, this field corresponds
| ||||
szOptionLinkType | OLNKT | char | OPT | NONE |
A code used to specify the relationship between the Option-ID and the Linked Option ID. Valid values are:
PKG
Option Package
XOP
| ||||
jdDateSelected | DTSEL | JDEDATE | OPT | NONE |
The last date that the option was selected. For example, if the buyer selected two ceiling fans on January 12, and then ordered two more
| ||||
mnCumulativeQuantitySelect | OSCQTY | MATH_NUMERIC | OPT | NONE |
The cummulative quantity selected during option selections. For example, if a buyer has previously ordered two ceiling fans, and later
| ||||
mnOptionExtendedAmount | OPTEXA | MATH_NUMERIC | OPT | NONE |
A value derived from the following calculation: (Option Quantity * Price) = Option Extended Amount | ||||
szLotNumber_HBLOT | HBLOT | char | OPT | INPUT |
The specific lot upon which the home will be constructed. | ||||
szComponent_OPTION | OPTION | char | OPT | INPUT |
A specific upgrade not included in the base house price and cost. In the General Accounting and Job Cost systems, this field corresponds
| ||||
mnCmpPrice_CSPR | CSPR | MATH_NUMERIC | OPT | OUTPUT |
Current Option sales prices. Based on the effective date in the Option Master file. |
None |
None |