1.Functional Description
1.1Purpose
This NER is used to push a change in the Installation Date of an Installed Base item to all the Base Warranty Contracts for that item. For all Base
Warranty Contracts in the F1721for the Installed Base item, the Contract Start Date is changed to the new Installation Date, and the Contract End
Date is re-calculated from the new Contract Start Date and the Contract Duration.
1.2Setup Notes and Prerequisites.
NUMB - Installed Base Item Number
CSDT - New Contract Start Date
1.3Special Logic
D1700960 - Push Date Change
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
mnInstalledBaseNumber_NUMB | NUMB | MATH_NUMERIC | REQ | INPUT |
An 8-digit number that uniquely identifies an asset. | ||||
jdNewContractStartDate_CSDT | CSDT | JDEDATE | REQ | INPUT |
The date you actually start work on the contract. | ||||
szProgramId | PID | char | REQ | INPUT |
The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry
|
None |
None |