D4803320B - Retrieve Crew Assignment Information
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
mnJobNumber_JOBS | JOBS | MATH_NUMERIC | REQ | BOTH |
The job number (work station ID) which executed the particular job. | ||||
cProcessEdits_EV01 | EV01 | char | OPT | INPUT |
An option that specifies the type of processing for an event. | ||||
cErrorCode_ERRC | ERRC | char | OPT | OUTPUT |
This error code indicates if any errors occurred during the creation of the Trip Document Detail (F4914) records by the Delivery Document
| ||||
cSuppressErrorMessages_SUPPS | SUPPS | char | OPT | INPUT |
A flag indicating whether or not runtime error messaging will occur when an error message is issued from a business function.
0 = allow
| ||||
szErrorMessageID_DTAI | DTAI | char | OPT | OUTPUT |
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or
| ||||
mnWorkOrder_DOCO | DOCO | MATH_NUMERIC | OPT | INPUT |
A number that identifies an original document. This document can be a voucher, a sales order, an invoice, unapplied cash, a journal entry,
| ||||
mnOperationsSequence_OPSQ | OPSQ | MATH_NUMERIC | OPT | INPUT |
A number used to indicate an order of succession.
In routing instructions, a number that sequences the fabrication or assembly steps in the
| ||||
szTypeOperationCode_OPSC | OPSC | char | OPT | INPUT |
A user defined code (30/OT) that indicates the type of operation. Valid values include: A Alternate routing TT Travel time IT Idle time T Text | ||||
szWorkCenter_MCU | MCU | char | OPT | INPUT |
An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit
| ||||
mnCrew_Manager_ANSA | ANSA | MATH_NUMERIC | OPT | OUTPUT |
The address book number of a manager or planner.
Note: A processing option for some forms allows you to enter a default value for this
| ||||
jdScheduledStartDate_SESD | SESD | JDEDATE | OPT | OUTPUT |
The calendar date that an operation or rate is scheduled to begin. | ||||
mnAssignedHours_AHRS | AHRS | MATH_NUMERIC | OPT | OUTPUT |
A number that indicates the hours that have been assigned to this task. | ||||
mnTaskUniqueKey_TSKID | TSKID | MATH_NUMERIC | OPT | OUTPUT |
A number that identifies a task that is used for resource scheduling. The task number is generated by the system. | ||||
jdScheduledEndDate_SEED | SEED | JDEDATE | OPT | OUTPUT |
The calendar date that an activity or rate is scheduled to end. This date is calculated by the constraints-based planning system. |
None |
None |