Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
mnJobNumber_JOBS | JOBS | MATH_NUMERIC | REQ | BOTH |
The job number (work station ID) which executed the particular job. | ||||
cActionCode_ACTN | ACTN | char | REQ | INPUT |
A code that specifies the action that is performed. Valid values are: A Add C Change | ||||
cErrorCode_ERRC | ERRC | char | OPT | OUTPUT |
This error code indicates if any errors occurred during the creation of the Trip Document Detail (F4914) records by the Delivery Document
| ||||
cSuppressErrorMessages_SUPPS | SUPPS | char | OPT | INPUT |
A flag indicating whether or not runtime error messaging will occur when an error message is issued from a business function.
0 = allow
| ||||
szErrorMessageID_DTAI | DTAI | char | OPT | OUTPUT |
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or
| ||||
nNumOfKeys_INT01 | INT01 | integer | OPT | INPUT |
Number of Days in Future to Query for Responses Due. | ||||
cReturnPointer_EV01 | EV01 | char | OPT | INPUT |
An option that specifies the type of processing for an event. | ||||
idhCursor_GENLNG | GENLNG | ID | OPT | BOTH |
General purpose ID variable. | ||||
cSchedulePeriod_SCHPD | SCHPD | char | OPT | NONE |
A code used to indicate which schedule period the system uses when displaying work within the Maintenance Scheduling Workbench
| ||||
jdScheduledStartDate_SESD | SESD | JDEDATE | OPT | NONE |
The calendar date that an operation or rate is scheduled to begin. | ||||
mnCrew_Manager_ANSA | ANSA | MATH_NUMERIC | OPT | NONE |
The address book number of a manager or planner.
Note: A processing option for some forms allows you to enter a default value for this
| ||||
szLeadTrade_MCULT | MCULT | char | OPT | NONE |
An alphanumeric code used to define the lead craft required to complete the work. The value entered is used as the default craft (work
| ||||
mnHoursAvailable_HRSAVL | HRSAVL | MATH_NUMERIC | OPT | NONE |
The total hours available for scheduled work during the schedule period. The available hours is multiplied by the load % to calculate the
| ||||
mnLoadPercentage_LDPC | LDPC | MATH_NUMERIC | OPT | NONE |
The load % is the portion of the forecasted hours that is to be considered for scheduling work. The load % should be set to provide a
|