D4200720 - RetrieveMarkupPercent
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
szFromBranch | MMCU | char | NONE | NONE |
A code that represents a high-level business unit. Use this code to refer to a branch or plant that might have departments or jobs, which
| ||||
szToBranch | CMCU | char | NONE | NONE |
A secondary or lower-level business unit. The system uses the value that you enter to indicate that a branch or plant contains several
| ||||
mnItemNumber | ITM | MATH_NUMERIC | NONE | NONE |
An inventory item number. The system provides three separate item numbers plus an extensive cross-reference capability to other item
| ||||
szCategoryCode | PRPX | char | NONE | NONE |
A user defined code (system 41, type P4) under which you can organize logically related items.
You can simplify the master planning
| ||||
jdEffectiveDate | DRQJ | JDEDATE | NONE | NONE |
The date that an item is scheduled to arrive or that an action is scheduled for completion. | ||||
mnPercentMarkup | PCMU | MATH_NUMERIC | NONE | NONE |
The percent markup is the percent the cost is to be marked up when the item is transfered from one branch to another. | ||||
cErrorFlag | EV01 | char | NONE | NONE |
An option that specifies the type of processing for an event. | ||||
mnBranchLevel | BRLV | MATH_NUMERIC | OPT | NONE |
Determines the level at which a component branch should be processed in multi-plant processing. The lowest level branches (which are
|
None |
F3403 Branch Relationships Master File |