D31P0090 - Cache Synchronize Sequence
Parameter Name | Data Item | Data Type | Req/Opt | I/O/Both |
---|---|---|---|---|
mnJobnumber | JOBS | MATH_NUMERIC | REQ | INPUT |
The job number (work station ID) which executed the particular job. | ||||
mnProjectNumber | PRJM | MATH_NUMERIC | REQ | INPUT |
A number that identifies an EPM project in the system. The project must be set up in the Add/Revise Project program (P31P011). | ||||
cCalculateCumulativeFlag | EV01 | char | OPT | INPUT |
An option that specifies the type of processing for an event. | ||||
szErrorMessageID | DTAI | char | OPT | OUTPUT |
A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or
|
None |
None |