CacheWorkOrderRouting

Cache Work Order Routing

Minor Business Rule

Object Name: B3102390

Parent DLL: CMFGBASE

Location: Client/Server

Language: C

Data Structure

D3102390A - CacheRouting

Parameter NameData ItemData TypeReq/OptI/O/Both
nNumberOfKeysINT02integerOPTNONE

Number of Days in the Past to Query for Quote Requests Received. 

nIndexIDINT03integerOPTNONE

Event point for Integer.

cErrorCodeERRCcharOPTNONE

This error code indicates if any errors occurred during the creation of the Trip Document Detail (F4914) records by the Delivery Document 
Set Server program (XT4914).

szErrorMessageIDDTAIcharOPTNONE

A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
special characters such as %, &, or +. You create new data items using system codes 55-59. You cannot change the alias.

cSuppressErrorMessageSUPPScharOPTNONE

A flag indicating whether or not runtime error messaging will occur when an error message is issued from a business function.        0 = allow 
runtime error message handling.        1 = suppress runtime error message handling.

cReturnCacheCursorEV02charOPTNONE

An option that specifies the type of processing for an event.

idCacheCursorGENLNGIDOPTNONE

General purpose ID variable.

cProcessModeACTNcharOPTNONE

A code that specifies the action that is performed. Valid values are: A Add C Change

mnOrderNumberDOCOMATH_NUMERICOPTNONE

A number that identifies an original document. This document can be a voucher, a sales order, an invoice, unapplied cash, a journal entry, 
and so on.

nCacheRowNumberINT01integerOPTNONE

Number of Days in Future to Query for Responses Due. 

mnOperationSequenceOPSQMATH_NUMERICOPTNONE

A number used to indicate an order of succession. In routing instructions, a number that sequences the fabrication or assembly steps in the 
manufacture of an item. You can track costs and charge time by operation. In bills of material, a number that designates the routing step in the 
fabrication or assembly process that requires a specified component part. You define the operation sequence after you create the routing 
instructions for the item. The Shop Floor Management system uses this number in the backflush/preflush by operation process. In engineering 
change orders, a number that sequences the assembly steps for the engineering change. For repetitive manufacturing, a number that 
identifies the sequence in which an item is scheduled to be produced. Skip To fields allow you to enter an operation sequence that you want to begin 
the display of information. You can use decimals to add steps between existing steps. For example, use 12.5 to add a step between steps 
12 and 13.

szTypeOfOperationOPSCcharOPTNONE

A user defined code (30/OT) that indicates the type of operation. Valid values include: A Alternate routing   TT Travel time   IT Idle time   T Text

szCostCenterMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

szOrderTypeDCTOcharOPTNONE

A user defined code (00/DT) that identifies the type of document. This code also indicates the origin of the transaction. J.D. Edwards has 
reserved document type codes for vouchers, invoices, receipts, and time sheets, which create automatic offset entries during the post 
program. (These entries are not self-balancing when you originally enter them.) The following document types are defined by J.D. Edwards and 
should not be changed: P Accounts Payable documents   R Accounts Receivable documents   T Payroll documents   I Inventory documents  
O Purchase Order Processing documents   J General Accounting/Joint Interest Billing documents   S Sales Order Processing documents

szOrderSuffixSFXOcharOPTNONE

In the A/R and A/P systems, a code that corresponds to the pay item. In the Sales Order and Procurement systems, this code identifies 
multiple transactions for an original order. For purchase orders, the code is always 000. For sales orders with multiple partial receipts against an 
order, the first receiver used to record receipt has a suffix of 000, the next has a suffix of 001, the next 002, and so on.

szRoutingTypeTRTcharOPTNONE

A user defined code (40/TR) that indicates the type of routing. You can define different types of routing instructions for different uses. For 
example:    M    Standard Manufacturing Routing    RWK  Rework Routing    RSH  Rush Routing You define the routing type on the work order 
header. The system then uses the specific type of routing that you define in the work order routing. Product Costing and Capacity Planning systems 
use only M type routings.

mnShortItemNumberKITMATH_NUMERICOPTNONE

The system provides for three separate item numbers.    1.   Item Number (short) - An eight-digit, computer assigned, completely 
non-significant item number.    2.   2nd Item Number - The 25-digit, free form, user defined alphanumeric item number.    3.   3rd Item Number - Another 
25-digit, free form, user defined alphanumeric item number.

sz2ndItemNumberKITLcharOPTNONE

The system provides for three separate item numbers.    1.   Item Number (short) - An eight-digit, computer assigned, completely 
non-significant item number.    2.   2nd Item Number - The 25-digit, free form, user defined alphanumeric item number.    3.   3rd Item Number - Another 
25-digit, free form, user defined alphanumeric item number. This is used in a parts list as either a parent or component number. In the Equipment 
Management system, this item is used for memo purposes only.

sz3rdItemNumberKITAcharOPTNONE

The system provides three separate item numbers:    1. Item Number (short) - An eight-digit, computer assigned, completely non-significant 
item number.    2. 2nd Item Number - The 25-digit, free form, user defined alphanumeric item number.    3. 3rd Item Number - Another 25-digit, 
free form, user defined alphanumeric item number.

szBranchPlantMMCUcharOPTNONE

A code that represents a high-level business unit. Use this code to refer to a branch or plant that might have departments or jobs, which 
represent lower-level business units, subordinate to it. For example:     o Branch/Plant (MMCU)     o Dept A (MCU)     o Dept B (MCU)     o Job 123 
(MCU) Business unit security is based on the higher-level business unit.

szLineIDLINEcharOPTNONE

A number that defines a production line or cell. Detailed work center operations can be defined inside the line or cell.

szAutoLoadDescriptionALDcharOPTNONE

This field is used to pull in a standard description from a user defined for the specified operation.

szDescriptionDSC1charOPTNONE

Brief information about an item; a remark or an explanation.

cTimeBasisCodeTIMBcharOPTNONE

A user defined code (30/TB) that indicates how machine or labor hours are expressed for a product. Time basis codes identify the time 
basis or rate to be used for machine or labor hours entered for every routing step. For example, 25 hours per 1,000 pieces or 15 hours per 
10,000 pieces. You can maintain the time basis codes in Time Basis Codes. The system uses the values in the Description-2 field on the User 
Defined Codes form for costing and scheduling calculations. The description is what the code represents, but is not used in calculations.

cPayPointCodeBFPFcharOPTNONE

A code that indicates whether a work center has labor, material, or both,backflushed through it when quantities are reported against 
operations occurring in the work center. If you do not override the routing record, the system uses the work center value as the default. Valid codes 
are:    0   Not a backflush work center    B Backflush material and labor    M Backflush material only    L Backflush labor only    P Preflush material 
only

cPayPointStatusPPRFcharOPTNONE

A code that indicates whether the operation should be taken to a status of complete or partially complete. Valid values are:    Blank Not 
reported    P        Partially complete    C        Completed 

szJobCategoryJBCDcharOPTNONE

A user defined code (07/G) that defines the jobs within your organization. You can associate pay and benefit information with a job type and 
apply that information to the employees who are linked to that job type.

mnAddressBookNumberAN8MATH_NUMERICOPTNONE

A number that identifies an entry in the Address Book system, such as employee, applicant, participant, customer, supplier, tenant, or 
location.

mnCriticalRatioCRTRMATH_NUMERICOPTNONE

Reserved by J.D. Edwards.

mnSlackTimeRatioSLTRMATH_NUMERICOPTNONE

Reserved by J.D. Edwards.

jdTransactionDateTRDJJDEDATEOPTNONE

The date that an order was entered into the system. This date determines which effective level the system uses for inventory pricing.

jdRequestedDateDRQJJDEDATEOPTNONE

The date that an item is scheduled to arrive or that an action is scheduled for completion.

jdStartDateSTRTJDEDATEOPTNONE

The start date for the order. You can enter this date manually, or have the system calculate it using a backscheduling routine. The routine 
starts with the required date and offsets the total leadtime to calculate the appropriate start date.

jdCompletionDateSTRXJDEDATEOPTNONE

The date that the work order or engineering change order is completed or canceled.

jdEffectiveFromDateEFFFJDEDATEOPTNONE

A date that indicates one of the following:     o When a component part goes into effect on a bill of material     o When a routing step goes into 
effect as a sequence on the routing for an item     o When a rate schedule is in effect The default is the current system date. You can enter 
future effective dates so that the system plans for upcoming changes. Items that are no longer effective in the future can still be recorded and 
recognized in Product Costing, Shop Floor Management, and Capacity Requirements Planning. The Material Requirements Planning system 
determines valid components by effectivity dates, not by the bill of material revision level. Some forms display data based on the effectivity 
dates you enter.

mnBeginTimePBTMMATH_NUMERICOPTNONE

A field that is used to enter the beginning time of the operation sequence for the work center operation on the routing.

mnEndTimePETMMATH_NUMERICOPTNONE

A field that is used to enter the ending time of the operation sequence for the work center operation on the routing.

cRequestedShiftCodeRSFTcharOPTNONE

cStartShiftCodeSSFTcharOPTNONE

cCompletedShiftCodeCSFTcharOPTNONE

mnPercentLeadtimeLTPCMATH_NUMERICOPTNONE

Future use This field is used to modify the normal logic in the backscheduling routine. If operation number 010 starts on day one and is 
expected to be completed on day ten, the normal backscheduling logic would specify a start day of day ten for the next operation number 020.  If it 
is not necessary to complete all items before beginning the second operation, we would then use the leadtime overlap percent to modify 
the calculated start date of the second operation. For instance a 50 percent overlap would calculate that the start date should be modified to 
start 50 percent sooner or the beginning of day six.  If the overlap percent was equal to 90 percent it would be scheduled to start on day two.

mnPercentOverlapPOVRMATH_NUMERICOPTNONE

A number that indicates the percentage that successive operations can overlap. The actual overlap percentage entered for the operation 
sequence is the percent by which that operation overlaps the prior operation. For example, if you enter 80%, this indicates that work can begin 
on the overlapped operation when 20% of the prior operation is completed. Notes:    1.   Overlapping has no effect on move and queue 
calculations.    2.   The percent entered must be less than or equal to 100%. Enter percents as whole numbers:  5% as 5.00

mnPercentOpPlannedYieldOPYPMATH_NUMERICOPTNONE

The planned output yield percent for a step. The Planned Yield Update program uses this value to update the cumulative percent in the 
routing and the operation scrap percent in the bill of material. Materials Requirements Planning uses the step scrap percent and the existing 
component scrap percent to plan component demand.

mnPercentCumPlannedYieldCPYPMATH_NUMERICOPTNONE

The cumulative planned output yield percent for a step. The system uses this value to adjust the operation step scrap percent for the 
components at that operation step. This enables the MRP system to use the operation step scrap percent along with the existing component scrap 
percent to plan component demand.

mnNextOperationNXOPMATH_NUMERICOPTNONE

The operation number with which the current operation can be simultaneously processed.

mnCrewSizeSETCMATH_NUMERICOPTNONE

The number of people who work in the specified work center or routing operation. The system multiplies the Run Labor value in the Routing 
Master table (F3003) by crew size during costing to generate total labor amounts. If the Prime Load Code is L or B, the system uses the total 
labor hours for backscheduling. If the Prime Load Code is C or M, the system uses the total machine hours for backscheduling without 
modification by crew size.

mnMoveTimeMOVDMATH_NUMERICOPTNONE

The planned hours that are required to move the order from this operation to the next operation in the same work center. If the Routing 
Master values are blank, the system retrieves the default value from the work order routing. However, the system uses these values only for 
backscheduling variable leadtime items.

mnQueueTimeQUEDMATH_NUMERICOPTNONE

The total hours that an order is expected to be in queue at work centers and moving between work centers. The system stores this value in 
the Item Branch table (F4102). You can calculate this value using the Leadtime Rollup program or you can enter it manually. When you run the 
Leadtime Rollup program, the system overrides manual entries and populates the table with calculated values.

mnStdMachineRunTimeRUNMMATH_NUMERICOPTNONE

The standard machine hours that you expect to incur in the normal production of this item.

mnStdLaborRunTimeRUNLMATH_NUMERICOPTNONE

The standard hours of labor that you expect to incur in the normal production of this item. The run labor hours in the Routing Master table 
(F3003) are the total hours that it takes the specified crew size to complete the operation. The hours are multiplied by the crew size during shop 
floor release and product costing.

mnStdLaborSetupTimeSETLMATH_NUMERICOPTNONE

The standard setup hours that you expect to incur in the normal completion of this item. This value is not affected by crew size.

mnActualLaborRunTimeLABAMATH_NUMERICOPTNONE

This is the actual labor time in hours recorded for the work order.

mnActualLaborSetupTimeSETAMATH_NUMERICOPTNONE

The actual time in hours of setup labor recorded against the work order operation.

mnShrinkFactorOPSRMATH_NUMERICOPTNONE

Future use. This field indicates the percentage of scrap that is typically encountered for this operation for this part.  If the quantity ordered is 
100,and we have historically had a shrinkage of 4% in this operation due to any factor, we would expect 96 to be completed and 4 to be 
scrapped.  This is a useful value for determining efficiency by comparing the completion to the expected 96 instead of the order for 100.

mnQtyOrderedUORGMATH_NUMERICOPTNONE

The quantity of units affected by this transaction.

mnQtyCompletedSOCNMATH_NUMERICOPTNONE

The number of units canceled in Sales Order or Work Order Processing, using either the entered or the primary unit of measure defined for 
this item. In manufacturing, this can also be the number of units scrapped to date.

mnQtyScrappedSOQSMATH_NUMERICOPTNONE

The number of units committed for shipment in Sales Order Entry, using either the entered or the primary unit of measure defined for this 
item. In the Manufacturing system and Work Order Time Entry, this field can indicate completed or scrapped quantities. The quantity type is 
determined by the type code entered.

mnQtyAtOperationQMTOMATH_NUMERICOPTNONE

The quantity that is physically at the step at the work center.

mnPieceWorkRatePWRTMATH_NUMERICOPTNONE

The rate to be paid for the type of component (piece) being produced.

szUOMUOMcharOPTNONE

A user defined code (00/UM) that indicates the quantity in which to express an inventory item, for example, CS (case) or BX (box).

mnHoursUnaccDirectLaborCTS1MATH_NUMERICOPTNONE

The number of unaccounted direct labor hours associated with a specific operation for a work order.

mnHoursUnaccSetupLaborCTS2MATH_NUMERICOPTNONE

The number of unaccounted setup labor hours associated with a specific operation for a work order.

mnHoursUnaccMachineCTS3MATH_NUMERICOPTNONE

The number of unaccounted machine hours associated with a specific operation for a work order.

mnAmountUnaccDirectLaborCTS4MATH_NUMERICOPTNONE

The amount of unaccounted direct labor associated with a specific operation for a work order.

mnAmountUnaccSetupLaborCTS5MATH_NUMERICOPTNONE

The amount of unaccounted setup labor associated with a specific operation for a work order.

mnAmountUnaccMachineCTS6MATH_NUMERICOPTNONE

The amount of unaccounted machine dollars associated with a specific operation for a work order.

szUnitNumberAPIDcharOPTNONE

A 12-character alphanumeric code used as an alternate identification number for an asset. This number is not required, nor does the 
system assign a number if you leave the field blank when you add an asset. If you use this number, it must be unique. For equipment, this is 
typically the serial number.

szMessageNumberSHNOcharOPTNONE

A generic rates and message code (48/SN) that is assigned to a standard note, message, or general narrative explanation. You can use 
this code to add instructional information to a work order. You set up codes for this field on the Generic Message/Rate Types table (F00191).

szBusinessProjectUnitOMCUcharOPTNONE

The business unit from an account number.  The account number business unit is usually found in the data item MCU, however, Distribution 
systems use the field MCU as the branch.

szObjectAccountOBJcharOPTNONE

The portion of a general ledger account that refers to the division of the Cost Code (for example, labor, materials, and equipment) into 
subcategories. For example, you can divide the Cost Code for labor into regular time, premium time, and burden. Note: If you use a flexible chart of 
accounts and the object account is set to 6 digits, J.D. Edwards recommends that you use all 6 digits. For example, entering 000456 is not 
the same as entering 456 because if you enter 456 the system enters three blank spaces to fill a 6-digit object.

szSubsidiarySUBcharOPTNONE

A subset of an object account. Subsidiary accounts include detailed records of the accounting activity for an object account.

mnVendorVENDMATH_NUMERICOPTNONE

The address book number of the preferred provider of this item.

cPOYPOYcharOPTNONE

Determines if the Work Order Generation program (P31410) creates a purchase order for a subcontracted operation within a routing. Valid 
values are:    Y Yes, create a purchase order.    N No, do not create a purchase order.

szKeyCompanyKCOcharOPTNONE

A number that, with the document number, document type and G/L date, uniquely identifies an original document, such as invoice, voucher, 
or journal entry. If you use the Next Numbers by Company/Fiscal Year feature, the Automatic Next Numbers program (X0010) uses the 
document company to retrieve the correct next number for that company. If two or more original documents have the same document number and 
document type, you can use the document company to locate the desired document.

szRelatedNumberRORNcharOPTNONE

A number that identifies a secondary purchase order, sales order, or work order that is associated with the original order. This number is for 
informational purposes only.

szRelatedOrderTypeRCTOcharOPTNONE

A user defined code (system 00, type DT) that indicates the document type of the secondary or related order. For example, a purchase 
order might be document type OP and might have been created to fill a related work order with document type WO.

mnRelatedLineNumberRLLNMATH_NUMERICOPTNONE

A number of the detail line on the related order for which the current order was created. For example, on a purchase order created to fill 
open sales orders, this is the line number of the sales order on which the item you are ordering appears.

szDocumentTypeDCTcharOPTNONE

A user defined code (00/DT) that identifies the origin and purpose of the transaction.  PeopleSoft reserves several prefixes for document 
types, such as, vouchers, invoices, receipts, and timesheets. The reserved document type prefixes for codes are: P Accounts payable 
documents R Accounts receivable documents  T Time and Pay documents I Inventory documents  O Purchase order documents  S Sales order 
documents 

szUserReservedCodeURCDcharOPTNONE

This is a 2 position code that is reserved for the user.  JDE does not currently use this field and will not utilize this field in the future.

jdUserReservedDateURDTJDEDATEOPTNONE

This is a 6 position code that is reserved for the user.  JDE does not currently use this field and will not utilize this field in the future.

mnUserReservedAmountURATMATH_NUMERICOPTNONE

This is a 15 position code that is reserved for the user.  JDE does not currently use this field and will not utilize this field in the future.

szUserReservedReferenceURRFcharOPTNONE

A 15-position reference that is reserved for the user.  J.D. Edwards does not currently use this field and does not plan to use it in the future.

mnUserReservedNumberURABMATH_NUMERICOPTNONE

This is a 8 position code that is reserved for the user.  JDE does not currently use this field and will not utilize this field in the future.

szUserIDUSERcharOPTNONE

The code that identifies a user profile.

szProgramIDPIDcharOPTNONE

The number that identifies the batch or interactive program (batch or interactive object). For example, the number of the Sales Order Entry 
interactive program is P4210, and the number of the Print Invoices batch process report is R42565. The program ID is a variable length value. 
It is assigned according to a structured syntax in the form TSSXXX, where: T The first character of the number is alphabetic and identifies the 
type, such as P for Program, R for Report, and so on. For example, the value P in the number P4210 indicates that the object is a 
program. SS The second and third characters of the number are numeric and identify the system code. For example, the value 42 in the number P4210 
indicates that this program belongs to system 42, which is the Sales Order Processing system. XXX The remaining characters of the numer are 
numeric and identify a unique program or report. For example, the value 10 in the number P4210 indicates that this is the Sales Order Entry 
program.

szWorkStationIDJOBNcharOPTNONE

The code that identifies the work station ID that executed a particular job.

jdDateUpdatedUPMJJDEDATEOPTNONE

The date that specifies the last update to the file record.

mnTimeOfDayTDAYMATH_NUMERICOPTNONE

The computer clock in hours:minutes:seconds.

szConsProdALDcharOPTNONE

This field is used to pull in a standard description from a user defined for the specified operation.

szIntermediateUOMUOMcharOPTNONE

A user defined code (00/UM) that indicates the quantity in which to express an inventory item, for example, CS (case) or BX (box).

mnIntermediateQtyQTYMATH_NUMERICOPTNONE

The number of units associated with an asset.

cIntermediateFlagCHARcharOPTNONE

cIngredientsFlagCHARcharOPTNONE

cCoByFlagCHARcharOPTNONE

cChangeFlagCHARcharOPTNONE

cActionCodeCHARcharOPTNONE

mnOrigOperationSequenceOPSQMATH_NUMERICOPTNONE

A number used to indicate an order of succession. In routing instructions, a number that sequences the fabrication or assembly steps in the 
manufacture of an item. You can track costs and charge time by operation. In bills of material, a number that designates the routing step in the 
fabrication or assembly process that requires a specified component part. You define the operation sequence after you create the routing 
instructions for the item. The Shop Floor Management system uses this number in the backflush/preflush by operation process. In engineering 
change orders, a number that sequences the assembly steps for the engineering change. For repetitive manufacturing, a number that 
identifies the sequence in which an item is scheduled to be produced. Skip To fields allow you to enter an operation sequence that you want to begin 
the display of information. You can use decimals to add steps between existing steps. For example, use 12.5 to add a step between steps 
12 and 13.

szOrigTypeOfOperationOPSCcharOPTNONE

A user defined code (30/OT) that indicates the type of operation. Valid values include: A Alternate routing   TT Travel time   IT Idle time   T Text

szOrigCostCenterMCUcharOPTNONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

jdOrigStartDateSTRTJDEDATEOPTNONE

The start date for the order. You can enter this date manually, or have the system calculate it using a backscheduling routine. The routine 
starts with the required date and offsets the total leadtime to calculate the appropriate start date.

jdOrigRequestedDateDRQJJDEDATEOPTNONE

The date that an item is scheduled to arrive or that an action is scheduled for completion.

mnOrigQtyOrderedUORGMATH_NUMERICOPTNONE

The quantity of units affected by this transaction.

szAssignedNameAUTAcharOPTNONE

This field lets you record the name of the person authorizing the loading of fuel.

szUMCapacityUOMCAPUcharOPTNONE

A unit of measure that you use to express the capacity of a production line. Examples of units of measure include hours, number of 
stampings, coats of paint, and so on. This item is used for repetitive processing only.

mnRunLaborCurrentCLHRMATH_NUMERICOPTNONE

This is the current labor hours from the Routing Master table (F3003) at the time the routing is attached to the production document. The run 
labor hours are the current labor hours multiplied by the crew size for the operation, and divided by the time basis code.

mnRunMachineCurrentCMHRMATH_NUMERICOPTNONE

The current machine hours from the Routing Master table (F3003) at the time the routing is attached to the production document. The run 
machine hours are the current machine hours divided by the time basis code.

szCostTypeCOSTcharOPTNONE

A code that designates each element of cost for an item. Examples of the cost object types are:   o  A1  Purchased raw material   o  B1  
Direct labor routing rollup   o  B2  Setup labor routing rollup   o  C1  Variable burden routing rollup   o  C2  Fixed burden routing rollup   o  Dx  Outside 
operation routing rollup   o  Xx  Extra add-ons, such as electricity and water  The optional add-on computations usually operate with the type 
Xx extra add-ons. This cost structure allows you to use an unlimited number of cost components to calculate alternative cost rollups. The 
system then associates these cost components with one of six user defined summary cost buckets.

mnSetupLaborCurrentCLHRMATH_NUMERICOPTNONE

This is the current labor hours from the Routing Master table (F3003) at the time the routing is attached to the production document. The run 
labor hours are the current labor hours multiplied by the crew size for the operation, and divided by the time basis code.

szLocationLOCNcharOPTNONE

The storage location from which goods will be moved.

mnResourceUnitsconsumedRUCMATH_NUMERICOPTNONE

A number that indicates how many of the line's resource units are needed to produce one item.

szWorkcenterBranchWMCUcharOPTNONE

This is the branch/plant to which the work center belongs and must exist in the business unit master (F0006) and branch plant constants file 
(F41001).

szProcessModuleACTPRFcharOPTNONE

A code that specifies the next action that the system performs in the process flow.

mnOrigCompItemKITMATH_NUMERICOPTNONE

The system provides for three separate item numbers.    1.   Item Number (short) - An eight-digit, computer assigned, completely 
non-significant item number.    2.   2nd Item Number - The 25-digit, free form, user defined alphanumeric item number.    3.   3rd Item Number - Another 
25-digit, free form, user defined alphanumeric item number.

mnAssetNumberNUMBMATH_NUMERICOPTNONE

An 8-digit number that uniquely identifies an asset.

cCopyFlagCHARcharOPTNONE

cKeyChangedCHARcharOPTNONE

szActivityCodeACTBcharOPTNONE

The aggregation of actions performed within an organization that are useful for purposes of activity-based costing.

mnRunMachineRateMACRMATH_NUMERICOPTNONE

A rate that the system uses to determine the machine run cost for a specific item at a specific operation in the Work With Routing Master 
program (P3003).

mnRunLaborRateLABPMATH_NUMERICOPTNONE

A number that specifies the rate used to determine the estimated cost of labor hours for a specific operation in the Enter/Change Routing 
program (P3003).

mnSetupLaborRateSETRMATH_NUMERICOPTNONE

A number that specifies the rate that you use to estimate the cost of setup labor for a specific operation in the Work With Routing Master 
program (P3003). Setup labor rate is expressed in hours.

szCompentencyTypeCMPEcharOPTNONE

A code that identifies a competency table or category for which you can track employee competencies. Valid values 
are: 01 Training 02 Skill 03 Accomplishment 04 Certification 05 Degree 06 Language  It is a user defined code (05/CY), but the values are hard-coded and cannot be 
changed. Therefore, each of the competencies that you track must pertain to one of these competency types. Adding additional values to this 
list requires system customizations.

szCompentencyCodeCMPCcharOPTNONE

A code that specifies a competency within a competency type. For example, a competency for the competency type "Skill" might be "C 
programming" or  "Driving a forklift."

mnCompetencyLevelFromCPLVLFRMATH_NUMERICOPTNONE

This value set the lowest value to be included in the rule criteria range for a competency level range selection.

mnCompetencyLevelToCPLVLTOMATH_NUMERICOPTNONE

This value set the highest value to be included in the rule criteria range for a competency level range selection.

cRuleMatchFlagCMRQcharOPTNONE

A field that indicates whether the resource must satisfy the requirements that define the rule criteria. Valid values are:    1   The resource must 
meet the rule criteria.    0   The rule criteria are optional.

mnF3003StdMachineRunTimeCMHRMATH_NUMERICOPTNONE

The current machine hours from the Routing Master table (F3003) at the time the routing is attached to the production document. The run 
machine hours are the current machine hours divided by the time basis code.

mnF3003StdLaborRunTimeCLHRMATH_NUMERICOPTNONE

This is the current labor hours from the Routing Master table (F3003) at the time the routing is attached to the production document. The run 
labor hours are the current labor hours multiplied by the crew size for the operation, and divided by the time basis code.

mnF3003StdLaborSetupTimeCSHRMATH_NUMERICOPTNONE

The current setup hours from the Routing Master table (F3003) at the time the routing is attached to the production document.

mnPercentOpYieldOPYPMATH_NUMERICOPTNONE

The planned output yield percent for a step. The Planned Yield Update program uses this value to update the cumulative percent in the 
routing and the operation scrap percent in the bill of material. Materials Requirements Planning uses the step scrap percent and the existing 
component scrap percent to plan component demand.

mnPercentCumYieldCPYPMATH_NUMERICOPTNONE

The cumulative planned output yield percent for a step. The system uses this value to adjust the operation step scrap percent for the 
components at that operation step. This enables the MRP system to use the operation step scrap percent along with the existing component scrap 
percent to plan component demand.

mnWorkIntermediateQtyQTYMATH_NUMERICOPTNONE

The number of units associated with an asset.

cShiftCodeRequestedRSFTcharOPTNONE

cShiftCodeStartSSFTcharOPTNONE

mnCostRunMachineHoursMATH01MATH_NUMERICOPTNONE

- - - Good Performance Low Value. 

mnCostRunLaborHoursMATH01MATH_NUMERICOPTNONE

- - - Good Performance Low Value. 

cPayableYNPAYABcharOPTNONE

This field specifies whether a general ledger account should be paid. Valid values are:    Y The account should be paid.    N The account 
should not be paid.

cBillableYNBILLBLEcharOPTNONE

A code that specifies whether the tax rate area applies to billable expenses (expenses billed directly to the client). Valid values 
are: Blank The tax rate area applies to nonbillable expenses only. 1 The tax rate area applies to billable expenses only. * The tax rate area applies to all 
expenses.  This field can help determine whether VAT tax is nonrecoverable.

mnActBillableRateACRTBMATH_NUMERICOPTNONE

The actual billable rate associated with a transaction.

mnActPayableRateACRTPMATH_NUMERICOPTNONE

The actual payable rate associated with a transaction.

mnEstimatedAmountEBILLMATH_NUMERICOPTNONE

mnActualDollarsACT$MATH_NUMERICOPTNONE

Amount of Actual Dollars

mnAmountOriginalDollarsACT$MATH_NUMERICOPTNONE

Amount of Actual Dollars

mnEstimatedBillableRateESRTBMATH_NUMERICOPTNONE

The estimated billable rate associated with a service.

mnEstimatedPayableRateESRTPMATH_NUMERICOPTNONE

The estimated payable rate associated with a transaction.

mnEstimatedPaymentAmountEPAAPMATH_NUMERICOPTNONE

This is the estimated payment amount used in service billing.

mnTotalBilledTOTBMATH_NUMERICOPTNONE

The total amount billed through this application number.

mnClaimAmountCLAMTMATH_NUMERICOPTNONE

The amount requested for providing a service.

jdBillDateDTBILJDEDATEOPTNONE

In service billing, the date a customer was billed for a service.

jdPaidDateDTPAYJDEDATEOPTNONE

The date a service provider was paid for a service.

mnPaymentAmountAGPTMATH_NUMERICOPTNONE

This data item is specific to the Notes Payable/Receivable system.

mnLaborRatePerHour1LBR1MATH_NUMERICOPTNONE

Under a Service Contract, the labor rate per hour charged while providing the service for each day of the week and for holidays.  For 
example, the hourly rate charged during a Help Desk Call or the hourly rate charged repairing the equipment on a Service Work Order.

jdActualStartDateD2JJDEDATEOPTNONE

Enter the actual start date for a project or job in this field. Use this information for reporting purposes.

mnStartTimeSTTIMATH_NUMERICOPTNONE

This is the start time for an operation or an order.

mnEstimatedEndingTimeATMMATH_NUMERICOPTNONE

The computer clock in hours:minutes:seconds.

szCostType_2COSTcharOPTNONE

A code that designates each element of cost for an item. Examples of the cost object types are:   o  A1  Purchased raw material   o  B1  
Direct labor routing rollup   o  B2  Setup labor routing rollup   o  C1  Variable burden routing rollup   o  C2  Fixed burden routing rollup   o  Dx  Outside 
operation routing rollup   o  Xx  Extra add-ons, such as electricity and water  The optional add-on computations usually operate with the type 
Xx extra add-ons. This cost structure allows you to use an unlimited number of cost components to calculate alternative cost rollups. The 
system then associates these cost components with one of six user defined summary cost buckets.

szPriceAdjustScheduleFourASN4charOPTNONE

A user defined code (40/AS) identifying a price and adjustment schedule. A price and adjustment schedule contains one or more 
adjustment types for which a customer or an item might be eligible. The system applies the adjustments in the sequence that you specify in the 
schedule. You link customers to a price and adjustment schedule through the customer billing instructions. When you enter a sales order, the 
system copies the schedule attached to the sold to address into the order header. You can override this schedule at the detail line level.

mnNegativeOperationSequenceOPSQMATH_NUMERICOPTNONE

A number used to indicate an order of succession. In routing instructions, a number that sequences the fabrication or assembly steps in the 
manufacture of an item. You can track costs and charge time by operation. In bills of material, a number that designates the routing step in the 
fabrication or assembly process that requires a specified component part. You define the operation sequence after you create the routing 
instructions for the item. The Shop Floor Management system uses this number in the backflush/preflush by operation process. In engineering 
change orders, a number that sequences the assembly steps for the engineering change. For repetitive manufacturing, a number that 
identifies the sequence in which an item is scheduled to be produced. Skip To fields allow you to enter an operation sequence that you want to begin 
the display of information. You can use decimals to add steps between existing steps. For example, use 12.5 to add a step between steps 
12 and 13.

szOperationStatusOPSTcharOPTNONE

User defined code system 31, type OS. The operation status code that identifies the current status of a work order or engineering change 
order as the operation steps in the routing are completed.

szInspectionCodeINPEcharOPTNONE

Future use. This is a user defined code specifying the type of normal inspection practice for this particular item.  Examples that could be 
established are:     o First Piece Inspection     o 100% Inspection     o Random     o First Piece Each Shift     o No Inspection

cLaborOrMachineLAMCcharOPTNONE

A code to designate whether the operation is labor or machine.

mnActualMachineRunTimeMACAMATH_NUMERICOPTNONE

This is the actual machine time in hours recorded against the work order.

szPriceAdjustScheduleServiceASN2charOPTNONE

This user defined code (40/AS) identifies a price and adjustment schedule. A price and adjustment schedule contains one or more 
adjustment types for which a customer or an item might be eligible. The system applies the adjustments in the sequence that you specify in the 
schedule. You link customers to a price and adjustment schedule through the customer billing instructions. When you enter a sales order, the 
system copies the schedule attached to the sold to address into the order header. You can override this schedule at the detail line level.

mnJobNumberJOBSMATH_NUMERICOPTNONE

The job number (work station ID) which executed the particular job.

cPOActivityStatusEV01charOPTNONE

An option that specifies the type of processing for an event.

mnPOJobNumberJOBSMATH_NUMERICOPTNONE

The job number (work station ID) which executed the particular job.

mnProcessIDPEIDMATH_NUMERICOPTNONE

A code that identifies the Inter-Process Communication ID.

mnTransactionIDTSIDMATH_NUMERICOPTNONE

The identifier used by the source system to identify the target system in cross-environment intercompany settlements. This identifier is set 
up in user defined codes 00/IC.

mnCanceledPOVendorVENDMATH_NUMERICOPTNONE

The address book number of the preferred provider of this item.

szCanceledPONumberRORNcharOPTNONE

A number that identifies a secondary purchase order, sales order, or work order that is associated with the original order. This number is for 
informational purposes only.

mnCanceledPOLineNoRLLNMATH_NUMERICOPTNONE

A number of the detail line on the related order for which the current order was created. For example, on a purchase order created to fill 
open sales orders, this is the line number of the sales order on which the item you are ordering appears.

mnSuccessiveOperationOPSQMATH_NUMERICOPTNONE

A number used to indicate an order of succession. In routing instructions, a number that sequences the fabrication or assembly steps in the 
manufacture of an item. You can track costs and charge time by operation. In bills of material, a number that designates the routing step in the 
fabrication or assembly process that requires a specified component part. You define the operation sequence after you create the routing 
instructions for the item. The Shop Floor Management system uses this number in the backflush/preflush by operation process. In engineering 
change orders, a number that sequences the assembly steps for the engineering change. For repetitive manufacturing, a number that 
identifies the sequence in which an item is scheduled to be produced. Skip To fields allow you to enter an operation sequence that you want to begin 
the display of information. You can use decimals to add steps between existing steps. For example, use 12.5 to add a step between steps 
12 and 13.

mnPrecedenceOffsetMATH01MATH_NUMERICOPTNONE

- - - Good Performance Low Value. 

szPrecedenceTypeGENSTRcharOPTNONE

Reserved by J.D. Edwards. Generic string data item.

cPrimeLoadCodeEV01charOPTNONE

An option that specifies the type of processing for an event.

mnAddressNumberManagerANSAMATH_NUMERICOPTNONE

The address book number of a manager or planner.   Note:  A processing option for some forms allows you to enter a default value for this 
field based on values for category codes 1 (Phase), 2, and 3.  You set up the default values on the Default Managers and Supervisors form.  
After you set up the default values and the processing option, the default information displays automatically on any work orders that you 
create if the category code criterion is met.  You can either accept or override the default value. 

mnSupervisorANPAMATH_NUMERICOPTNONE

The address book number of the supervisor.

mnAddNoAssignedToANPMATH_NUMERICOPTNONE

The address book number of the person assigned to do the work.

cMaintenanceScheduleFlagWSCHFcharOPTNONE

A flag used to indicate if the work (i.e. work order, labor detail step, or PM Projection) is scheduled to a crew. Valid values are listed in UDC 
13/WS (Maintenance Schedule Flag).

cResourcesAssignedTRAFcharOPTNONE

A code that indicates whether a resource has been assigned to a work order through the Resource Assignment program (P48331). You 
can choose a value from UDC table 00/ZO.

Related Functions

None

Related Tables

None