ScheduleResourceUnits

Schedule Resource Units

Minor Business Rule

Object Name: B3100230

Parent DLL: CMFGBASE

Location: Client/Server

Language: C

Data Structure

D3100230 - Schedule Resource Units

Parameter NameData ItemData TypeReq/OptI/O/Both
szBranchPlantMMCUcharNONENONE

A code that represents a high-level business unit. Use this code to refer to a branch or plant that might have departments or jobs, which 
represent lower-level business units, subordinate to it. For example:     o Branch/Plant (MMCU)     o Dept A (MCU)     o Dept B (MCU)     o Job 123 
(MCU) Business unit security is based on the higher-level business unit.

szWorkCenterMCUcharNONENONE

An alphanumeric code that identifies a separate entity within a business for which you want to track costs. For example, a business unit 
might be a warehouse location, job, project, work center, branch, or plant. You can assign a business unit to a document, entity, or person for 
purposes of responsibility reporting. For example, the system provides reports of open accounts payable and accounts receivable by 
business unit to track equipment by responsible department. Business unit security might prevent you from viewing information about business units 
for which you have no authority.

szUnitOfMeasureUMcharNONENONE

A user defined code (00/UM) that identifies the unit of measurement for an amount or quantity. For example, it can represent a barrel, box, 
cubic meter, liter, hour, and so on.

jdInputDateDRQJJDEDATENONENONE

The date that an item is scheduled to arrive or that an action is scheduled for completion.

jdOutputDateSTRTJDEDATENONENONE

The start date for the order. You can enter this date manually, or have the system calculate it using a backscheduling routine. The routine 
starts with the required date and offsets the total leadtime to calculate the appropriate start date.

cScheduleTypeWScharNONENONE

A user defined code to designate intra-pay period work schedules. This code can be used for reporting and to select employees to be 
included in a payroll run. For example:    A Monday through Friday    B Saturday through Wednesday    C Monday through Thursday (4 x 10 hrs)

mnHoursRequiredWRHRMATH_NUMERICNONENONE

The number of work hours that the manufacturing plant operates per day.

mnHoursCurrentWRHRMATH_NUMERICNONENONE

The number of work hours that the manufacturing plant operates per day.

mnHoursBalanceWRHRMATH_NUMERICNONENONE

The number of work hours that the manufacturing plant operates per day.

cErrorCodeERRCcharNONENONE

This error code indicates if any errors occurred during the creation of the Trip Document Detail (F4914) records by the Delivery Document 
Set Server program (XT4914).

mnWorkHrPerDayWRHRMATH_NUMERICOPTNONE

The number of work hours that the manufacturing plant operates per day.

cFixedVariableLeadtimeMRPPcharOPTNONE

A code that determines whether the system uses fixed or variable leadtimes. This code works in conjunction with the value from either the 
Level Leadtime field or the Leadtime Per Unit field. Valid codes are:    F Fixed leadtime - The system calculates work order start dates using the 
value from the Leadtime Level field.    V Variable leadtime - The system calculates work order start dates using the value from the Leadtime 
Per Unit field.

cPOOverrideNoOfEmpEV01charOPTNONE

An option that specifies the type of processing for an event.

mnNumberOfResourcesMATH01MATH_NUMERICOPTNONE

- - - Good Performance Low Value. 

cPrimeLoadCodePILCcharOPTNONE

A code that determines if a work center is machine or labor intensive. The system also uses prime load codes in Resource Requirements 
Planning and Capacity Requirements Planning calculations to develop load profiles. Valid codes are:    L Run labor hours only    M Machine 
hours only    B Run labor plus setup labor hours    C Machine plus setup hours    O Other (will not generate resource units)

Related Functions

None

Related Tables

F3007 Work Center Resource Units