CacheRetrieveCostsforColumns

Cache Retrieve Costs for Columns

Minor Business Rule

Object Name: B1301000

Parent DLL: CCRIN

Location: Client/Server

Language: C

Data Structure

D1301000 - Cache Retrieve Costs for Columns

Parameter NameData ItemData TypeReq/OptI/O/Both
szCacheNameJOBcharREQINPUT

Job Number

cCostFlagEV01charOPTINPUT

An option that specifies the type of processing for an event.

szColumnName01COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName02COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName03COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName04COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName05COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName06COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName07COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName08COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName09COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

szColumnName10COLNcharOPTINPUT

An alphanumeric code that identifies a column. A column represents a performance factor, such as the average unit cost for an item and the 
last cost that you paid for an item. For example, you can review performance factors to compare suppliers' costs and services for a certain 
item.

mnResult01AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult02AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult03AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult04AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult05AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult06AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult07AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult08AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult09AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnResult10AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

szEquipmentGroupEQGPcharOPTINPUT

The name corresponding to a particular equipment group to be analyzed.

szEquipmentSubGroupEQSPcharOPTINPUT

The name corresponding to a particular equipment subgroup, which is in an equipment group, to be analyzed.

mnAssetItemNumberNUMBMATH_NUMERICOPTBOTH

An 8-digit number that uniquely identifies an asset.

szErrorMessageIDDTAIcharOPTOUTPUT

A code that identifies and defines a unit of information. It is an alphanumeric code up to 8 characters long that does not allow blanks or 
special characters such as %, &, or +. You create new data items using system codes 55-59. You cannot change the alias.

cEquipmentSubFlagEV01charOPTINPUT

An option that specifies the type of processing for an event.

szAccountIdAIDcharOPTBOTH

A number that the system assigns to each general ledger account in the Account Master table (F0901) to uniquely identify it. 

mnRollUPResult01AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult02AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult03AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult04AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult05AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult06AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult07AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult08AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult09AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnRollUPResult10AO1OWMATH_NUMERICOPTOUTPUT

A value that the method of computation and processing options are set to in order to determine which fields appear on this form. Valid 
values are:   o  Force +/- Amounts. This field appears with Methods F, G, O, Q, and S. Incremental change to the Force Amounts (FA) ledger. The 
system calculates force amounts.   o  Force Total Amounts. This field appears with Methods F, G, O, Q, and S. The new total in the Force 
Amounts (FA) ledger. The system calculates +/- force amounts.   o  Percent Complete. This field appears with Methods F, G, O, P, and S. The new 
total in the Percent Complete (F%) ledger.   o  Estimate to Complete Amounts. This field appears only with Method E. The system adds the 
values in this field, the Estimate to Complete Units fields, and Unit Rate field to the Actual Units and Actual Amounts fields to determine the 
estimate total (projected final values). The system updates the Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.   o  
Estimate Total Amounts. This field appears only with Method E. The values in this field are the projected final values. The system updates the 
Projected Final Amounts (HA) and Projected Final Units (HU) ledgers.

mnSequenceNumber1SEQMATH_NUMERICOPTINPUT

A number that specifies the sequence of information.

cSubledgerTypeSBLTcharOPTINPUT

A user defined code (00/ST) that is used with the Subledger field to identify the subledger type and how the system performs subledger 
editing. On the User Defined Codes form, the second line of the description controls how the system performs editing. This is either hard-coded 
or user defined. Valid values include: A Alphanumeric field, do not edit   N Numeric field, right justify and zero fill   C Alphanumeric field, right 
justify and blank fill  

szSubledgerSBLcharOPTINPUT

A code that identifies a detailed, auxiliary account within a general ledger account. A subledger can be an equipment item number or an 
address book number. If you enter a subledger, you must also specify the subledger type.

Related Functions

None

Related Tables

None